BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Warwickshire Geological Conservation Group (WGCG) - ECPv6.17.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Warwickshire Geological Conservation Group (WGCG)
X-ORIGINAL-URL:https://www.wgcg.co.uk
X-WR-CALDESC:Events for Warwickshire Geological Conservation Group (WGCG)
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Europe/London
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20150329T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20151025T010000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20160327T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20161030T010000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20170326T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20171029T010000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20160420T190000
DTEND;TZID=Europe/London:20160420T210000
DTSTAMP:20210409T081659Z
CREATED:20210316T130237Z
LAST-MODIFIED:20210409T081659Z
UID:4425-1461178800-1461186000@www.wgcg.co.uk
SUMMARY:April 2016 talk: The History of the Harbury Railway Cutting\, by Luke Swain\, Network Rail
DESCRIPTION:Luke Swain CGeol \, Senior Asset Engineer (Geotechnics) — Network Rail: \n\n\n\nThe History of the Harbury Railway Cutting. \n\n\n\nSince the Great Western Railway came to Harbury in Warwickshire\, the geology which underlies the village\, has provided its fair share of challenges to all of the infrastructure owners. First constructed in circa 1850\, the original plan was to construct a tunnel but this soon proved a significant and risky task for the engineers. The solution was to opt for an alternative and to construct the deepest hand dug cutting known in Europe at this time. The most significant landslip to occur in the Network Rail era occurred on the 30th January 2014 and resulted in 400\,000 tonnes of soil and rock from the Lower Jurassic period moving towards the railway. The remediation that followed has provided an interesting insight into the Geology of cutting.
URL:https://www.wgcg.co.uk/event/april-2016-talk-the-history-of-the-harbury-railway-cutting-by-luke-swain-network-rail/
LOCATION:St Francis of Assisi R C Church
END:VEVENT
END:VCALENDAR